- 2023-04-21
Assembling working and load bearing platform with formwork for concrete slab and beam concreting works.
Client required working platform to be at 14 m height, formwork for beam and slab concreting at project altitudes, 15 m and 16,20 m respectively. All scaffolding must be capable for load of concreting works and be in most minimal quantity.