BRIEF DESCRIPTION

The client requires the temporary high span bridge on the construction site to hang the high voltage electricity cables.

We have offered assembly of temporary scaffold bridge structure.

PROJECT DESCRIPTION

Project TypeCommercial
ClientReal estate development company
Completion Date2020

SCOPE OF WORK

  • The highest span 39.5m
  • Structural load in linear meters ~ 50kg
  • Supports are only available at the ends of the structure
  • Selected to use Layher FW system
  • Individual design
  • Using technologically advanced Layher FW and Allround systems for shoring.
  • The structure is mounted by crane
  • Systems used: Layher FW, Allround.
  • Individual design and solution
  • All scaffolding assembling and material is Prorentus Ltd responsibility.
  • Fast and professional assembling provided by Prorentus Ltd.
  • Technologically advanced solution.
© Copyright 2020 Prorentus