• September

      27

      2019
    • 1876
    • 0
    Article on media about our major projects of 2019

    Article on media about our major projects of 2019

    We have posted an article on media to sum up and show the major projects of 2019. This year was challenging and has given us an opportunity to stand out in the projects where we created various tailor-made engineering solutions to reach the maximum effectiveness.  Read the article VIDEO LINK www.statybunaujienos.lt   The full article:

    • April

      5

      2019
    • 2220
    • 0
    This year we participated in Rail Baltica Global Forum 2019 again

    This year we participated in Rail Baltica Global Forum 2019 again

    This year we participated in Rail Baltica Global Forum 2019 in Vilnius. It was an interesting event, with many information and good contacts. Now we continue preparation and work in building bridges for Rail Baltica project.   http://www.railbaltica.org/forum/

    • November

      30

      2018
    • 1073
    • 0
    Never stop learning and improving

    Never stop learning and improving

    On 29th of November we had a seminar for our engineers about scaffolding for professionals. Baltic Scaffolders Association invited lecturer Paul Brouwer for training.

    • August

      21

      2018
    • 1475
    • 0
    New Prorentus shoring contracting project – Kaunas CHP plant

    New Prorentus shoring contracting project – Kaunas CHP plant

    We are starting to work in Kaunas CHP plant project. Prorentus team supplies shoring contracting service in this power plant. The client will receive full service including not only the material, but also management of the shoring assembling, disassembling, exploitation monitoring, professional certified scaffolders, on-site training, logistics, site office and storage for instant material supply

    • June

      29

      2018
    • 1139
    • 0
    Prorentus shoring solution for IMG factory in Panevėžys

    Prorentus shoring solution for IMG factory in Panevėžys

    Support for prefabricated beams at 3,7m height. Fast project realization. According to assembling rules beams should be supported only in small distance at the edge of beams. The load which needs to be supported is 32 kN per one beam. For supporting every beam TG-60 towers were used. They prevent beam’s twisting in slab assembling stage. Because

    • June

      12

      2018
    • 995
    • 0
    Giatec concrete sensors for managing risks and time saving

    Giatec concrete sensors for managing risks and time saving

    Prorentus engineers are using Giatec concrete sensors for managing risks and saving time. The sensors are waterproof, wireless and allows real-time temperature and maturity monitoring of concrete. The sensor is placed in the concrete formwork (installed on the rebar) before pouring. Using the mobile app you can view the temperature and resulting concrete strength, maturity

COST CALCULATOR

Use our form to estimate the initial cost of renovation or installation.

REQUEST A QUOTE
Latest Posts
Most Viewed
Text Widget

Here is a text widget settings ipsum lore tora dolor sit amet velum. Maecenas est velum, gravida Vehicula Dolor

© Copyright 2017 - 2022 Prorentus