• June

    29

    2018
  • 1140
  • 0
Prorentus shoring solution for IMG factory in Panevėžys

Prorentus shoring solution for IMG factory in Panevėžys

Support for prefabricated beams at 3,7m height. Fast project realization. According to assembling rules beams should be supported only in small distance at the edge of beams. The load which needs to be supported is 32 kN per one beam. For supporting every beam TG-60 towers were used. They prevent beam’s twisting in slab assembling stage. Because

Support for prefabricated beams at 3,7m height. Fast project realization. According to assembling rules beams should be supported only in small distance at the edge of beams. The load which needs to be supported is 32 kN per one beam. For supporting every beam TG-60 towers were used. They prevent beam’s twisting in slab assembling stage. Because of individual calculation and design – optimal quantities of equipment were used.

NEWSLETTER SUBSCRIPTION

    ESTIMATE YOUR PROJECT COSTS

    Send us your project details for a free cost estimation.

    REQUEST A QUOTE
    Latest Posts
    Most Viewed
    © Copyright 2017 - 2022 Prorentus