- 2023-04-21
Load bearing and work platform for facade element installation in Vilnius, Konstitucijos ave. 15.
The Layher TG-60 and Allround systems were chosen for this project. The construction is anchored using steel cables that support structural stability, because the minimum equipment quantity is used in order to eliminate logistics as much as possible. Logistics is very critical, because all scaffold was moved to working area in 108 meter height using elevator and people workforce. The customer installed a mobile lifting equipment on the supporting work platform with which they assembled the last facade element at the top of the building.