- 2023-04-21
The client needed a load bearing scaffolding structure for a new overpass above the existing and busy roundabout. Cross section of the overpass has a constant variable slope and curved shape.
The client needed a load bearing scaffolding structure for a new overpass above the existing and busy roundabout. Cross section of the overpass has a constant variable slope and curved shape.
Project Type | Infrastructure |
Client | UAB Kauno tiltai |
Completion Date | 2022 |