Concrete pouring was completed in industrial factory (Kaliningrad)
Prorentus Ltd. was hired for shoring contracting at newly build industrial factory in Kaliningrad. We had to arrange 1300 sq.m. of technically challenging and difficult beams slab in different levels of heights with a safe working requirements. Project was outside of EU territory, it was also a challenge to coordinate all processes: logistics, project coordination on
Prorentus Ltd. was hired for shoring contracting at newly build industrial factory in Kaliningrad. We had to arrange 1300 sq.m. of technically challenging and difficult beams slab in different levels of heights with a safe working requirements. Project was outside of EU territory, it was also a challenge to coordinate all processes: logistics, project coordination on site, supervising. Big challenge was drainage channels on the ground and factory’s equipment which made project harder.
Because of big heights between slabs, we used load bearing TG – 60 towers in combination of Layher Allround system. We used two different type of system to show our flexibility in both systems. In order to fully utilize load bearing capacity of TG – 60 we used load bearing consoles made of Layher Allround parts. We also added integrated safety consoles all around the structure and staircases to get on to a slab. This project also was designed to use aluminium beams as main shoring beams and prefabricated wooden trusses to shape slab.
See full description and photos of this project.